OUR PROJECTS
Built for today. Designed for tomorrow

Complete installation of charging stations, including cabinets and expansion from the power supply cabinet

The underground cable route has been surveyed, mapped, and converted into a digital file for precise documentation.

Reading the nodes of the luminaires that we have installed and commissioned.

Complete installation of 36 new charging points, including all cabling work, as well as the placement and connection of the cabinet.

Installation and implementation of security components around the charging stations.

Complete above-ground installation of data, fiber, and low-voltage cables.

Installation of cable trays and laying of various cables.

Installation of a new NXS unit and the necessary connections by means of installing an intermediate cabinet.

Implementation of a communication module and integration of a load balancing system.

Supply and installation of a new cabinet, including all connection works, UTP and OTDR testing, and a preliminary inspection of the technical installation.
The scope also covers the construction of a tiled platform and the restoration and finishing of the roadside verge.

Blowing, installation, and connection of the fiber optic cable, including necessary splicing and OTDR measurements, for the commissioning of communication modules.

Complete installation of cable trays, cable ladders, and cabling, including the connection of all cables, full labeling, inspection, and final handover with an as-built dossier.
The total scope includes full project relief (turnkey delivery) and covers all necessary schematics and site layout drawings (inplantings).

Complete assembly, supply, and connection of a Main Low Voltage Board (ALSB), including inspection and final handover with an as-built dossier.

Civil works for utility infrastructure: saw-cutting of asphalt pavement, removal of materials, installation of cables and protective ducts, and full restoration of the trench using hot asphalt. Delivered with clean finishing in compliance.

Complete delivery, installation, configuration, and functional testing of an interface/gateway for Ethernet and Modbus-SL communication. The system was successfully integrated into the existing installation environment and handed over fully operational with validated protocol communication.

Complete delivery, construction, and finishing of a newly installed footpath, including all required substructure repairs and surrounding adjustments. The final layout was digitally surveyed and delivered as a DWG file, accurately reflecting the new alignment as built.

Restoration of faded road markings in public space. Includes surface cleaning, removal of residual paint where necessary, and reapplication of durable line markings in accordance with current traffic and visibility standards.

Application of traffic pictograms on bicycle lanes, including directional arrows and cyclist symbols. Existing markings had faded or been removed and were reinstated in compliance with current standards for visibility and road safety.

Complete redesign of public parking areas. The scope included the removal of worn or outdated line markings and the application of new parking layout striping, including bay markings, traffic flow arrows, and relevant pictograms. The end result: a clearly defined and regulation-compliant parking area.

Execution of indoor installation works using prewired conduits for electrical and HVAC systems. The setup includes grouped and secured power and control lines routed towards future connection points. All cable routes are laid with precision and prepared for integration into the main distribution board. This is part of the rough-in phase, with full compliance for upcoming inspection and final commissioning.
'Let’s make it happen — the Energenius way'